Thursday, May 30, 2019

Database Development :: essays research papers

Network UpgradeIn order to resolve interlocking related worrys The Airframe Corporation (TAC) has decided to upgrade the existing net income consisting of a mix of Token Ring and shred Ethernet hubs to a switched Ethernet network. The purpose of this paper is to discuss several aspects of the abide plan for the upgrade. This discussion will be made in threes sections. Section one will include interpret definition, while section two will deal with work breakdown anatomical structure and estimated schedules, and section three will cover costing and risk analysis. The bulge definition will include a background and statement of need, project objectives, the tutelage and goals or the project, the project approach, the project organization, and a task responsibility matrix. The work breakown structure (WBS) will consist of a WBS chart, a task function and critical path, a project schedule, and project reporting. The costing and risk analysis will contain a cost plan, a project ba seline, performance measures, project evaluation and reporting, and project termination.Background and Statement of NeedThe project team has identified several issues with the current network infrastructure. The first is the availability and cost of keepsake ring hardware. Ethernet is the dominant network topology and is included on many devices at no cost. Equipment with token ring interfaces can be found notwithstanding are much more expensive. Another problem is that the current hardware is about 10 years old and is experiencing increased maintenance costs. Another problem is that the majority of the existing cable plant does not meet minimal category 5 standards.Project ObjectivesThe project has been budgeted $200,000 for cable installation, labor and hardware and the timeframe for the project should not exceed six months. The network upgrade should be designed to support the companies needs for a minimum of seven years without major rework. The project will need to have minim al impact on the network operations, as a result much of the work will need to be accomplished after-hours or on weekends. Mission and Goals of ProjectThe goals of the project areIncrease network availability to 99.999%. achieve project within budget.Complete project on time.Upgrade category 3 cable plant to category 5e or better.Project ApproachThe project manager will entrap a team of individuals with the appropriate skills. Network engineering will design and build the network. A cable vendor will be selected by network engineering. Platform engineering will upgrade clients and desktops. Networking engineering will be responsible for selecting an equipment vendor, designing the network, locating a cable vendor, and identifying cable runs that need to be replaced.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.